Fewer hours doesn't have to mean fewer results.
The 6 risks you can't afford to overlook:
Hasty changes to labor policies open the door to fines, lawsuits, and labor disputes.
REQUEST A QUOTE
The challenge isn't just legal. It isn't just operational. It's both, at the same time.
Two fronts. One diagnosis. Six weeks to get ready.
Most firms approach the 40-hour reform as a legal issue. Others reduce it to an exercise in process reengineering. Both fall short. At Prodensa, from day one, we integrate the people and operational aspects into a single assessment—because simply adjusting the time clock without redesigning operations or preparing leadership isn’t compliance: it’s improvisation.
Our dual approach is led by two executives with decades of manufacturing experience in Mexico, who work in parallel on your plant and provide you with a single roadmap.
The two pillars of diagnosis:
Assessment
- Document review: policies, individual contracts, internal regulations, pay scales.
- Interviews and focus groups with leadership and key employees.
- Workplace climate and engagement survey.
- Compensation and benefits benchmarking against the local manufacturing market.
- "Employer of Choice" checklist to position the company as a leading employer.
Framework
- Value Stream Mapping and analysis of material and information flow.
- Analysis of theoretical vs. actual capacity and OEE measurement.
- Identification of bottlenecks and sources of variability.
- Evaluation of standard work, quality systems, and maintenance practices.
- Gemba walks and assessment of daily management routines, tiered KPIs, and governance.
The Combined Result
A single, integrated assessment that provides:
- Quantified gaps on both fronts, with data and direct on-site observation.
- An Opportunities Matrix prioritized by impact versus feasibility.
- A roadmap with three time horizons: short term (3–6 months, quick wins), medium term (6–18 months, leadership development and structured governance), and long term (18+ months, Manufacturing 5.0 enablers and cultural consolidation).
All within six weeks, ready for your executive committee to make decisions before the reform is imposed on them.
Concrete documents. Hard data. Actionable decisions.
At the end of the six weeks, you’ll receive a comprehensive package of six deliverables designed so that your executive committee can make decisions, your operations team can execute them, and your legal department can rest easy.
A structured 6-week process. No improvisation.
Our methodology combines the disciplines required for the assessment: document review, direct on-site observation, technical analysis, and benchmarking. We don’t come to apply a one-size-fits-all template—we come to assess your operation using tools proven in over 1,000 manufacturing projects in Mexico, and to provide you with a data-driven baseline upon which you can make executive decisions with confidence.
We apply the diagnostic tools specific to each pillar:
- Operations: Value Stream Mapping, analysis of theoretical vs. actual capacity, OEE measurement, cycle time and bottleneck studies, standard work evaluation, and quality systems.
- People: Digital workplace climate survey administered to the entire workforce, benchmarking of compensation and benefits against the local manufacturing market, and evaluation against the Premium Employer Checklist.
40 Years Supporting Manufacturing in Mexico. We weren't just starting out when the reform began.
Since 1985, Prodensa has been a strategic partner to foreign investors and domestic manufacturing groups operating in Mexico. We have supported more than a thousand manufacturing projects across fifteen industries—from the initial setup of IMMEX operations to the reengineering of plants that have been in operation for decades. The 40-hour workweek reform is just another chapter in a book we’ve been writing for four decades. You wouldn’t wing it with a problem of this magnitude—and neither would we.
The Numbers That Back Up the Promise
The Prodensa Way™: philosophy + knowledge + execution
TPW is not a framework imported from a global consulting firm. It is a model built and refined directly on the shop floor in Mexico over four decades, integrating three inseparable elements: the philosophy of how to earn the trust of a plant manager, in-depth knowledge of Mexico’s regulatory, cultural, and labor union framework, and disciplined execution that translates analysis into measurable results.MORE




